115kV Line Relay Replacement and DFR Installations
Tangibl prepared detailed electric substation engineering design drawings for review, and issue for construction (IFC) submittals.
Tangibl prepared detailed electric substation engineering design drawings for review, and issue for construction (IFC) submittals.
A trade agreement and supply chain disruptions have taken the focus off technological improvement and shifted it toward a bigger picture of energy security and the ability to meet policy goals of greater electrification.
Lead Sheathing of Cables A recent Wall Street Journal investigation found more than 2,000 lead-sheathed telecom and power cables across the nation, and AT&T has confirmed that roughly 200,000 miles …
Tangibl prepared detailed electric substation engineering design drawings for review, and issue for construction (IFC) submittals.
A trade agreement and supply chain disruptions have taken the focus off technological improvement and shifted it toward a bigger picture of energy security and the ability to meet policy goals of greater electrification.
Case Study | Utility Engineering & Consulting 34.5kV Line Terminal and Pilot Wire Relay Replacement Tangibl was requested to provide preliminary engineering and detailed design services for the replacement of …
Case Study | Utility Engineering & Consulting Air- and Gas-Insulated Substation Facilities Studies Tangibl was requested by our client, a transmission owner in the PJM Interconnection, to develop two different …
Case Study | Utility Engineering & Consulting Fast Trip No Reclose Relay Program Tangibl was retained by a mid-Atlantic utility to provide preliminary engineering and detailed design for its multi-year …
Tangibl developed a series of study-grade cost estimates for a large transmission and distribution utility in the mid-Atlantic U.S.
Tangibl made a high-level review of the construction documents regarding the rerouting and construction of the 230kV generation tie lines for a generating facility located in southeastern Pennsylvania.