Skip to content
Tangibl Group
Menu
  • HOME
  • WHAT WE DO
    • UTILITY ENGINEERING & CONSULTING
    • POWER ENGINEERING & CONSULTING
    • UTILITY RATES CONSULTING
    • POWER PROJECT DEVELOPMENT
    • POWER REGULATORY SERVICES
  • WHY CHOOSE US
  • TEAM
  • CASE STUDIES
  • BLOG
  • CONTACT

Category: Case Studies

Home » Case Studies
independent electric transmission nighttime
Case Studies

Independent Transmission Consulting

Tangibl originated and raised development funding for a series of small gas-fired generation projects in the shale-gas regions of PJM.

electric distribution conversion design
Case Studies

13kV Conversion Area Design – Aerial

Electric distribution conversion design: Tangibl completed a series of design packages for converting distribution facilities from 4kV to 13kV.

electric distribution pole replacement program
Case Studies

Condemned Pole Replacement Program – Aerial

Electric distribution pole replacement program: Tangibl completed a design package for replacement of 900+ distribution wood poles.

electric distribution facilities relocation design
Case Studies

13kV and 69kV Highway Relocation Design – Aerial

Electric distribution facilities relocation design: Tangibl completed a design package for relocating 13kV distribution and 69kV subtransmission facilities.

Power Project Development
Case Studies

Project Development of Fast Start Fast Ramp Resources

Fast start fast ramp resources: Tangibl originated and raised development funding for small gas-fired generation projects in shale-gas regions of PJM.

Electric substation
Case Studies

13.2kV Distribution Design – Underground

Underground electric distribution design: Tangibl completed a set of design packages for rearrangement of underground distribution circuits.

Case Studies

11kV and 22kV Distribution Design – Underground

Tangibl completed a design package for installation of a new underground electric distribution conduit and manhole design.

Case Studies

115kV Line Relay Replacement and DFR Installations

Electric transmission preliminary and detailed engineering: Tangibl provided services for transmission system upgrades.

transformer construction
Case Studies

Yes, We Can Make This Fit. Really.

Tangibl prepared detailed urban electric substation engineering design drawings for review, and issue for construction (IFC) submittals.

Case Studies

34.5kV Line Terminal and Pilot Wire Relay Replacement

Case Study | Utility Engineering & Consulting 34.5kV Line Terminal and Pilot Wire Relay Replacement When a distribution utility in New York faced challenges with their existing pilot wire protection …

Posts navigation

Older posts

Recent Posts

  • Confronting the Growing Risks of Resource Adequacy in the Power Sector
  • Independent Transmission Consulting
  • Tangibl Launches Richmond Office to Support Growing Regional Client Base
  • 13kV Conversion Area Design – Aerial
  • Data Center Growth Is Outpacing the Grid — What Comes Next?
  • Condemned Pole Replacement Program – Aerial
  • 13kV and 69kV Highway Relocation Design – Aerial
  • Project Development of Fast Start Fast Ramp Resources
  • 13.2kV Distribution Design – Underground
  • 11kV and 22kV Distribution Design – Underground

Tangibl Group is an engineering consulting and professional services firm serving the utility, power generation, and networked infrastructure industries.

Get Connected

  • LinkedIn
  • Facebook
  • YouTube

201 King of Prussia Road
Suite 110
Radnor, PA 19087 USA

610-255-2333

© 2025 Tangibl Group, Inc. | Privacy Policy
Skip to content
Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset