Category: Case Studies

Home » Case Studies
electric distribution conversion design
Case Studies

13kV Conversion Area Design – Aerial

Tangibl originated and raised development funding for a series of small gas-fired generation projects in the shale-gas regions of PJM.

electric distribution pole replacement program
Case Studies

Condemned Pole Replacement Program – Aerial

Tangibl originated and raised development funding for a series of small gas-fired generation projects in the shale-gas regions of PJM.

electric distribution facilities relocation design
Case Studies

13kV and 69kV Highway Relocation Design – Aerial

Tangibl originated and raised development funding for a series of small gas-fired generation projects in the shale-gas regions of PJM.

Power Project Development
Case Studies

Project Development of Fast Start Fast Ramp Resources

Tangibl originated and raised development funding for a series of small gas-fired generation projects in the shale-gas regions of PJM.

Electric substation
Case Studies

13.2kV Distribution Design – Underground

Tangibl prepared detailed electric substation engineering design drawings for review, and issue for construction (IFC) submittals.

Case Studies

11kV and 22kV Distribution Design – Underground

Tangibl prepared detailed electric substation engineering design drawings for review, and issue for construction (IFC) submittals.

Case Studies

115kV Line Relay Replacement and DFR Installations

Tangibl prepared detailed electric substation engineering design drawings for review, and issue for construction (IFC) submittals.

transformer construction
Case Studies

Yes, We Can Make This Fit. Really.

Tangibl prepared detailed electric substation engineering design drawings for review, and issue for construction (IFC) submittals.

Case Studies

34.5kV Line Terminal and Pilot Wire Relay Replacement

Case Study | Utility Engineering & Consulting 34.5kV Line Terminal and Pilot Wire Relay Replacement When a distribution utility in New York faced challenges with their existing pilot wire protection …

Case Studies

Air- and Gas-Insulated Substation Facilities Studies

Case Study | Utility Engineering & Consulting Air- and Gas-Insulated Substation Facilities Studies Tangibl was requested by our client, a transmission owner in the PJM Interconnection, to develop two different …

Posts navigation

Older posts

Recent Posts

  • Tangibl Launches Richmond Office to Support Growing Regional Client Base
  • 13kV Conversion Area Design – Aerial
  • Data Center Growth Is Outpacing the Grid — What Comes Next?
  • Condemned Pole Replacement Program – Aerial
  • 13kV and 69kV Highway Relocation Design – Aerial
  • Project Development of Fast Start Fast Ramp Resources
  • 13.2kV Distribution Design – Underground
  • 11kV and 22kV Distribution Design – Underground
  • 115kV Line Relay Replacement and DFR Installations
  • The Energy Transition’s Going to Happen – Just Not the Way You’re Being Told

Tangibl Group is an engineering consulting and professional services firm serving the utility, power generation, and networked infrastructure industries.

Get Connected

  • LinkedIn
  • Facebook
  • YouTube

201 King of Prussia Road
Suite 110
Radnor, PA 19087 USA

610-255-2333

© 2025 Tangibl Group, Inc. | Privacy Policy
Skip to content
Open toolbar Accessibility Tools

Accessibility Tools

  • Increase TextIncrease Text
  • Decrease TextDecrease Text
  • GrayscaleGrayscale
  • High ContrastHigh Contrast
  • Negative ContrastNegative Contrast
  • Light BackgroundLight Background
  • Links UnderlineLinks Underline
  • Readable FontReadable Font
  • Reset Reset